Working principle of pipe jacking
Date:2023-07-04 View(s):394 Tag:Working principle of pipe jacking
Pipe jacking construction is an underground pipeline construction method developed after shield construction. It does not require excavation of surface layers, and can pass through roads, railways, rivers, surface buildings, underground structures, and various underground pipelines.
Pipe jacking construction uses the thrust of the main jacking cylinder and the relay room between pipelines to push the tool pipe or road-header from the working well through the soil layer to the receiving well. At the same time, the pipeline immediately after the tool pipe or the boring machine was buried between the two wells, in order to realize the construction method of laying underground pipelines without excavation.